[EventId:202108021605_review] Prices for interval 02-Aug-2021 16:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 2 August 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 02-Aug-2021 16:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202108021600_review] Prices for interval 02-Aug-2021 16:00 are subject to review
Issued by Australian Energy Market Operator Ltd at 1555 hrs on 2 August 2021
PRICES ARE SUBJECT TO REVIEW for dispatch interval 02-Aug-2021 16:00.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202108021535_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 02 August 2021 15:35
Issued by Australian Energy Market Operator Ltd at 1535 hrs on 2 August 2021
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 August 2021.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1535 hrs on 2 August 2021.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 01/08/2021
Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 01/08/2021
Refer Market Notice 89175
The AEMO Intervention Event and all associated directions are cancelled from 1600 hrs 02/08/2021
Manager NEM Real Time Operations
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units currently expected to be synchronised in SA from 2230 hrs 02/08/2021 to 1630 hrs 03/08/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
[EventId:202108021330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 02 August 2021 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 2 August 2021
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 August 2021.
Refer to market notice: 89189
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 2 August 2021.
This is an AEMO autogenerated Market Notice.
[EventId:202108021030_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 02 August 2021 10:30
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 August 2021
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 August 2021.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1030 hrs on 2 August 2021.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202108020710_confirmed] Prices for interval 02-Aug-2021 07:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0730 hrs on 2 August 2021
PRICES ARE NOW CONFIRMED for dispatch interval 02-Aug-2021 07:10.
In accordance with Market Notice 89177 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202108020730_confirmed] Prices for interval 02-Aug-2021 07:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0730 hrs on 2 August 2021
PRICES ARE NOW CONFIRMED for dispatch interval 02-Aug-2021 07:30.
In accordance with Market Notice 89181 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.