Cancellation of the Actual (LOR2) condition in the South Australia region
Cancellation of the Actual (LOR2) condition in the South Australia region
Refer to AEMO Electricity Market Notice No. 54687
The Actual LOR2 condition in the South Australia Region is cancelled at 1135 hrs 10/8/16
Manager NEM Real Time Operations
Actual LOR2 South Australia Region
Actual LOR2 South Australia Region
Refer AEMO Electricity Market Notice 54624
An actual LOR2 condition has been declared for the South Australia region from 0745 hrs until further notice during a planned outage of Heywood No1 500 kV bus in the Victoria region
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16
Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 54507 is cancelled at 2030 hrs 14/07/16
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16.
An Actual LOR1 condition has been declared for the SA Region from 1745 hrs.
The Actual LOR1 condition is forecast to exist until 2030 hrs
The contingency capacity reserve required is 440 MW
The minimum reserve available is 342 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16
Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 544785 is cancelled at 2100 hrs 13/07/16
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16.
An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 2100 hrs
The contingency capacity reserve required is 400 MW
The minimum reserve available is 281 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016
AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No 54458 is cancelled at 1930 hrs Tuesday, 12 July 2016.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.
An Actual LOR1 condition has been declared for the South Australia Region.
From 1830 hrs to 1930 hrs Tuesday, 12 July 2016
The contingency capacity reserve required is 400 MW
The minimum reserve available is 224 MW
Manager NEM Real Time Operations
Cancellation of the Actual (LOR1) condition in the SA region - 8/07/2016
Cancellation of Actual (LOR1) condition in the SA region - 8/07/2016
The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.54371 is cancelled at 2000 hrs 8/07/2016.
Manager NEM Real Time Operations