Update - FORECAST LACK OF RESERVE LEVEL 1 (LOR1) in the New South Wales region -PD PASA.
Update - FORECAST LACK OF RESERVE LEVEL 1 (LOR1) in the New South Wales region -PD PASA.
Refer to AEMO Electricity Market Notice 57296
AEMO declares forecast LOR1 conditions for the New South Wales region for the following periods.
Friday 10th February 2017 from 1200 hrs to 1400 hrs
The minimum reserve available is 737 MW.
Friday 10th February 2017 from 1830 hrs to 2030 hrs
The minimum reserve available is 764 MW.
This calculation is based on a LOR1 trigger level of 1400 MW.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PD PASA
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PD PASA
AEMO declares a Forecast LOR1 condition for the South Australia Region.
From 1330 hrs to 1530 hrs and 1800 to 1900 hrs Thursday 9th February 2017
The contingency capacity reserve required is 420 MW
The minimum reserve available is 217 MW
Manager NEM Real Time Operations
Update - FORECAST LACK OF RESERVE LEVEL 1 (LOR1) in the New South Wales region -ST PASA.
Update - FORECAST LACK OF RESERVE LEVEL 1 (LOR1) in the New South Wales region -ST PASA.
Refer to AEMO Electricity Market Notice 52724
AEMO declares forecast LOR1 conditions for the New South Wales region for the following periods.
Friday 10th February 2017 from 1200 hrs to 1400 hrs
The minimum reserve available is 817 MW.
Friday 10th February 2017 from 1730 hrs to 1900 hrs
The minimum reserve available is 776 MW.
This calculation is based on a LOR1 trigger level of 1400 MW.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PD PASA
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PD PASA
AEMO declares a Forecast LOR1 condition for the South Australia Region.
From 1530 hrs to 1700 hrs and 1830 to 1930 hrs Thursday 9th February 2017
The contingency capacity reserve required is 400 MW
The minimum reserve available is 241 MW
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PDPASA
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PDPASA
AEMO declares a Forecast LOR1 condition for the South Australia Region.
From 1630 hrs to 1900 hrs 8/2/17
The contingency capacity reserve required is 400 MW
The minimum reserve available is 277 MW
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region beginning on 10/02/2017
The Forecast LOR1 condition in the NSW region advised in AEMO Market Notice No. 57258 has been updated at 1400 hrs 08/02/2017 for the following periods:
1. From 1430 hrs to 1730 hrs on 10/02/2017.
The minimum reserve available is 828 MW.
2. From 1430 hrs to 1700 hrs on 11/02/2017.
The minimum reserve available is 1200 MW.
The contingency capacity reserve required for the above periods is 1400 MW.
Harmohan Singh
AEMO Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PDPASA
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia Region - PDPASA
AEMO declares a Forecast LOR1 condition for the South Australia Region.
From 1630 hrs to 1900 hrs 9/2/17
The contingency capacity reserve required is 400 MW
The minimum reserve available is 302 MW
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region on 10/02/2017
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1500 hrs to 1700 hrs on 10/02/2017
The contingency capacity reserve required is 1400 MW.
The minimum reserve available is 1084 MW.
Harmohan Singh
AEMO Operations
Update - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region - PD PASA
Update - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region - PD PASA
Refer to AEMO Electricity Market Notice No. 57232
AEMO declares a Forecast LOR1 condition for the NSW Region.
From 1230 hrs to 1630 hrs Monday, 6 February 2017
The contingency capacity reserve required is 1400 MW
The minimum reserve available is 1026 MW
Manager NEM Real Time Operations