Market Notices

87786SETTLEMENTS RESIDUE01/07/2021 03:05:33 PM

[EventId:202107011505_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 01 July 2021 15:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1505 hrs on 1 July 2021

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 1 July 2021.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1505 hrs on 1 July 2021.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
87785RESERVE NOTICE01/07/2021 03:11:11 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 01/07/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1700 hrs to 1830 hrs 01/07/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1125 MW.

Manager NEM Real Time Operations


87784MARKET INTERVENTION01/07/2021 02:17:42 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units currently expected to be synchronised in SA from 0100 hrs 02/07/2021 to 1530 hrs 02/07/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 01/07/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
87783NON-CONFORMANCE01/07/2021 12:55:11 PM

NON-CONFORMANCE Region SA1 Thursday, 1 July 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE SA1 Region Thursday, 1 July 2021

AEMO declared a schedule generating unit non-conforming

Unit: ADPBA1G
Duration: 01/07/2021 12:45 to 01/07/2021 12:55
Amount: 6 MW
Constraint: NC-S_ADPBA1G

Auto-generated on behalf of Manager NEM Real Time Operations
87782MARKET SYSTEMS01/07/2021 11:54:30 AM

CHG0064858 : Unplanned System Maintenance - Declared Wholesale Gas Market (DWGM)

Change Number: CHG0064858

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Expedited

Service/ Component: Declared Wholesale Gas Market

Change Title: Unplanned System Maintenance - Declared Wholesale Gas Market (DWGM)

Change Start Date & Time: 01/07/2021 18:00:00 AEST

Change End Date & Time: 01/07/2021 21:00:00 AEST

Outage Start Date & Time: 01/07/2021 18:30:00 AEST

Outage End Date & Time: 01/07/2021 20:30:00 AEST

Change Description:

Unplanned System Maintenance - Declared Wholesale Gas Market (DWGM)

Environment: Production

Participant Impact and Requirements:

DWGM market system (Webexchanger and MIBB) outage from 18:30 to 20:30 AEST on 01/07/21 due to unplanned maintenance.

The following impacts are expected during the maintenance activities:
- All access to the Declared Wholesale Gas Market Production Systems will be unavailable.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
87781RECLASSIFY CONTINGENCY01/07/2021 03:04:55 AM

Cancellation of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 & No.3 220 kV Lines line and Numurkah Solar Farm line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: VIC1

Lines: Dederang - Glenrowan No.1 & No.3 220 kV Lines and Numurkah Solar Farm

Cancellation time: 01/07/2021 03:04

Constraint set(s) revoked:
V-NIL_DDGN_NSF_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
VIC1-NSW1


Refer AEMO Electricity Market Notice 87778

Auto-generated on behalf of Manager NEM Real Time Operations
87780RECLASSIFY CONTINGENCY01/07/2021 02:59:55 AM

Cancellation of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: VIC1

Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV

Cancellation time: 01/07/2021 02:59

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 87779

Auto-generated on behalf of Manager NEM Real Time Operations
87779RECLASSIFY CONTINGENCY01/07/2021 01:55:20 AM

Reclassification of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV

Duration: 01/07/2021 01:55 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
87778RECLASSIFY CONTINGENCY30/06/2021 11:59:48 PM

Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 & No.3 220 kV Lines line and Numurkah Solar Farm line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Dederang - Glenrowan No.1 & No.3 220 kV Lines and Numurkah Solar Farm

Duration: 30/06/2021 23:59 until further notice

Constraint set(s) invoked:
V-NIL_DDGN_NSF_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
VIC1-NSW1


Auto-generated on behalf of Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm