Market Notices

90660RESERVE NOTICE18/09/2021 07:50:16 AM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region beginning on 21/09/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 90620 has been updated at 0730 hrs 18/09/2021 to the following:

[1.] From 1800 hrs 21/09/2021 to 1830 hrs 21/09/2021.
The forecast capacity reserve requirement is 434 MW.
The minimum capacity reserve available is 341 MW.

[2.] From 2100 hrs 21/09/2021 to 2300 hrs 21/09/2021.
The forecast capacity reserve requirement is 434 MW.
The minimum capacity reserve available is 271 MW.

[3.] From 1900 hrs 22/09/2021 to 2100 hrs 22/09/2021.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 395 MW.


Manager NEM Real Time Operations
90659RECLASSIFY CONTINGENCY18/09/2021 04:18:56 AM

Cancellation of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Cancellation time: 18/09/2021 04:18

Constraint set(s) revoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Refer AEMO Electricity Market Notice 90658

Auto-generated on behalf of Manager NEM Real Time Operations
90658RECLASSIFY CONTINGENCY18/09/2021 03:16:46 AM

Reclassification of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Duration: 18/09/2021 03:16 until further notice

Constraint set(s) invoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Auto-generated on behalf of Manager NEM Real Time Operations
90657RESERVE NOTICE17/09/2021 10:42:15 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 21/09/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 1900 hrs 21/09/2021 to 2000 hrs 21/09/2021.
The forecast capacity reserve requirement is 242 MW.
The minimum capacity reserve available is 212 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
90655PRICES UNCHANGED17/09/2021 05:30:01 PM

[EventId:202109171705_confirmed] Prices for interval 17-Sep-2021 17:05 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1725 hrs on 17 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 17-Sep-2021 17:05.

In accordance with Market Notice 90643 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90654PRICES UNCHANGED17/09/2021 05:29:07 PM

[EventId:202109171725_confirmed] Prices for interval 17-Sep-2021 17:25 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1725 hrs on 17 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 17-Sep-2021 17:25.

In accordance with Market Notice 90649 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90653PRICES UNCHANGED17/09/2021 05:28:22 PM

[EventId:202109171720_confirmed] Prices for interval 17-Sep-2021 17:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1725 hrs on 17 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 17-Sep-2021 17:20.

In accordance with Market Notice 90648 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90652PRICES UNCHANGED17/09/2021 05:27:39 PM

[EventId:202109171715_confirmed] Prices for interval 17-Sep-2021 17:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1725 hrs on 17 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 17-Sep-2021 17:15.

In accordance with Market Notice 90647 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90651PRICES UNCHANGED17/09/2021 05:26:49 PM

[EventId:202109171710_confirmed] Prices for interval 17-Sep-2021 17:10 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1725 hrs on 17 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 17-Sep-2021 17:10.

In accordance with Market Notice 90646 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.