Market Notices

90428NON-CONFORMANCE13/09/2021 10:15:20 AM

NON-CONFORMANCE Region NSW1 Monday, 13 September 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Monday, 13 September 2021

AEMO declared a schedule generating unit non-conforming

Unit: MP1
Duration: 13/09/2021 10:05 to 13/09/2021 10:15
Amount: 22 MW
Constraint: NC-N_MP1

Auto-generated on behalf of Manager NEM Real Time Operations
90427GENERAL NOTICE13/09/2021 10:11:59 AM

Planned outage of Heywood - South East No.1 line in the South Australia (SA) region on 15/09/2021 and 16/09/2021

AEMO ELECTRICITY MARKET NOTICE

The Heywood - South East No.1 line in the South Australia (SA) region is planned to be out of service as follows:
- 1530 hrs to 2300 hrs on 15/09/2021; and
- 1530 hrs to 2300 hrs on 16/09/2021.

A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM. If separation occurs, load may be interrupted due to the operation of the Automatic Under Frequency Load Shedding (AUFLS) scheme in SA.

The credible separation contingency is managed as follows:

-When power transfer is from SA to Victoria, contingency lower FCAS will be sourced from SA.
-When power transfer is from Victoria to SA, due to the 47-52Hz island separation frequency band advised by the SA jurisdiction, contingency raise FCAS is not sourced in SA and the AUFLS scheme may respond to low frequency events.
-Power transfer will be restricted on Victoria - South Australia interconnector (Heywood interconnector) to manage system security following the loss of the next contingency.

Forecast capacity reserves in the SA region are currently sufficient to meet electricity demand during the planned outage.

The following constraint sets have been invoked for this outage:

F-I-HYSE
I-HYSE
I-VS_050
S-HYSE
V-HYTX_M12

Refer AEMO Network Outage Schedule (NOS) for further details.

AEMO Operations
90426GENERAL NOTICE13/09/2021 10:11:06 AM

Outage Cancelled - Planned outage of Heywood - South East No. 1 line in the South Australia (SA) region on 14/09/2021 and 15/09/2021

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market notice 90302.

The Heywood - South East No. 1 line in the South Australia (SA) region was planned to be outage of service from 14 and 15/09/2021. This outage has been cancelled.

All constraint sets associated with this outage have been revoked.

AEMO Operations.
90425GENERAL NOTICE13/09/2021 10:09:38 AM

Outage Cancelled - Planned outage of Heywood No.1 500 kV busbar and Heywood - Tarrone 500 kV line in the Victoria region on 15/09/2021

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market notice 90303.

The Heywood No.1 500 kV busbar and Heywood-Tarrone 500 kV line in Victoria (VIC) Region were planned to be out of service on 15/09/2021. This outage has been cancelled.

All constraint sets associated with this outage have been revoked.

AEMO Operations.
90424PRICES UNCHANGED13/09/2021 08:34:55 AM

[EventId:202109130810_confirmed] Prices for interval 13-Sep-2021 08:10 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0830 hrs on 13 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 13-Sep-2021 08:10.

In accordance with Market Notice 90414 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90423PRICES UNCHANGED13/09/2021 08:34:10 AM

[EventId:202109130830_confirmed] Prices for interval 13-Sep-2021 08:30 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0830 hrs on 13 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 13-Sep-2021 08:30.

In accordance with Market Notice 90418 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90422PRICES UNCHANGED13/09/2021 08:33:17 AM

[EventId:202109130825_confirmed] Prices for interval 13-Sep-2021 08:25 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0830 hrs on 13 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 13-Sep-2021 08:25.

In accordance with Market Notice 90417 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90421PRICES UNCHANGED13/09/2021 08:32:34 AM

[EventId:202109130820_confirmed] Prices for interval 13-Sep-2021 08:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0830 hrs on 13 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 13-Sep-2021 08:20.

In accordance with Market Notice 90416 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
90420PRICES UNCHANGED13/09/2021 08:30:20 AM

[EventId:202109130815_confirmed] Prices for interval 13-Sep-2021 08:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0830 hrs on 13 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 13-Sep-2021 08:15.

In accordance with Market Notice 90415 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.