Market Notices

53523MARKET SYSTEMS25/05/2016 07:18:16 PM

Planned System Maintenance (Site Transfer) on Market Settlement and Transfer Solutions (MSATS) Completed

Change Number: CHG0038481

Notification issued to: Market Notice


Notification Type: Completed

Change Type: Normal

Service/ Component: Market Settlements & Transfer System

Change Title: Planned System Maintenance (Site Transfer) on Market Settlement and Transfer Solutions (MSATS)

Change Description:
Transfer completed successfully

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
53522INTER-REGIONAL TRANSFER25/05/2016 05:03:29 PM

Inter-Regional Transfer Limit Variation - Lower Tumut to Yass (03) 330kV Transmission Line - NSW Region - 25 May 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - Lower Tumut to Yass (03) 330kV Transmission Line - NSW Region - 25 May 2016

The planned outage of Lower Tumut to Yass (03) 330kV Transmission Line was scheduled to complete at 1600 hrs 26/05/16.

The outage has completed early

The following constraint set for this outage was revoked at 1700 hrs 25/05/16
N-LTYS_03

The constraint set contains equations with the following interconnectors on the left hand side:
V-S-MNSP1
VIC1-NSW1

See AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
53521INTER-REGIONAL TRANSFER25/05/2016 04:25:00 PM

Interregional Transfer Limit variation, South Australia Region Wednesday 25 May 2016

AEMO ELECTRICITY MARKET NOTICE

Interregional Transfer Limit Variation, South Australia Region Wednesday 25 May 2016

At 1458hrs, the Canowie to Robertstown 275kV transmission line in the South Australia region tripped. .There was a prior planned outage of the Davenport to Canowie 275kV transmission line.

The following constraint sets are now invoked for these outages

S-X_DVCV+CNRB+RBCB
S-CNHL_HAL

The outage constraints contain equations with the following interconnector on the LHS

V-S-MNSP1

See the AEMO NOS for further information

Manager NEM Real Time Operations
53520MARKET SYSTEMS25/05/2016 02:22:23 PM

Planned System Change - EMMS Pre-Production: Generator Ramp Rate Rule Change

Change Number: CHG0039229

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: Electricity Market Management System

Change Title: Planned System Change - EMMS Pre-Production: Generator Ramp Rate Rule Change

Change Start Date & Time: 30/05/2016 10:00:00 AEST

Change End Date & Time: 30/05/2016 12:00:00 AEST


Change Description:

This change is to support the new generator ramp rate rules starting on 1st July 2016.

As part of this change AEMO will publish data informing Participants of their Minimum Ramp Rates including Generator DUID and individual unit max capacities. (Refer to the AEMO Tech Spec 931 issued 18th March 2016 for more information.)

The new minimum Ramp Rates will become effective and be used in validation from trading day 08/06/16 in Pre-Production and from 01/07/16 in Production.

Environment: Pre-Production

Participant Impact and Requirements:

This rule change results in some DUIDs having a changed Minimum Ramp Rate used in offer validation. AEMO encourages participants to validate their own offering systems in Pre-Production before the Production implementation date.

AEMO reminds participants to ensure that any previously accepted offers are revised for compliance with the new Minimum Ramp Rate. AEMO will contact Participants if they are potentially in breach of the Minimum Ramp Rate rule requirements before the rule becomes effective.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
53519MARKET SYSTEMS25/05/2016 02:15:35 PM

Planned System Outage - Gas Supply Hub - Moomba Trading Locations Update in Production

Change Number: CHG0038899

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: Gas Supply Hub

Change Title: Planned System Outage - Gas Supply Hub - Moomba Trading Locations Update in Production

Change Start Date & Time: 31/05/2016 19:00:00 AEST

Change End Date & Time: 31/05/2016 22:00:00 AEST


Outage Start Date & Time: 31/05/2016 19:00:00 AEST

Outage End Date & Time: 31/05/2016 22:00:00 AEST


Change Description:

This change is implemented for Gas Supply Hub Moomba project to update 2 new trading locations and to add a Spread product between Moomba and Wallumbilla to facilitate trading between the two markets.

Environment: Production

Participant Impact and Requirements:

Awareness of this outage. Outage is expected and access will be restricted during the times mentioned in the outage section.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
53518MARKET SYSTEMS25/05/2016 02:09:17 PM

Planned System Change - MSATS Pre-Production Mid-Year 2016 - Release 46.85

Change Number: CHG0038803

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: MSATS - Consumer Administration and Transfer Solution

Change Title: Planned System Change - MSATS Pre-Production Mid-Year 2016 - Release 46.85

Change Start Date & Time: 01/06/2016 09:00:00 AEST

Change End Date & Time: 01/06/2016 12:00:00 AEST


Outage Start Date & Time: 01/06/2016 09:00:00 AEST

Outage End Date & Time: 01/06/2016 12:00:00 AEST


Change Description:

The MSATS Pre-Production system will be upgraded with the release 46.85 as per the change notice 930 issued on 16th March 2016.
Note: There are no schema changes associated with this release

Environment: Pre-Production

Participant Impact and Requirements:

Awareness of this Outage. MSATS Pre-Production environment will be unavailable during the outage times mentioned above.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
53517NON-CONFORMANCE25/05/2016 12:25:17 AM

NON-CONFORMANCE Region VIC1 Wednesday, 25 May 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE VIC1 Region Wednesday, 25 May 2016

AEMO declared a schedule generating unit non-conforming

Unit: YWPS2
Duration: 25/05/2016 00:00 to 25/05/2016 00:25
Amount: -27 MW
Constraint: NC-V_YWPS2

Auto-generated on behalf of Manager NEM Real Time Operations
53516POWER SYSTEM EVENTS24/05/2016 06:57:10 PM

Update Non-credible contingency event - NSW region - 24 May 2016

AEMO ELECTRICITY MARKET NOTICE

Update Non-credible contingency event - NSW region - 24 May 2016

Refer market notice 53511,53515

At 0950 hrs the Tuggerah 330kV circuit breakers 212A and 2M2A opened simultaneously.

At 1827 hrs the Tuggerah 330kV circuit breakers 212A and 2M2A were returned to service.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.


Manager NEM Real Time Operations
53515POWER SYSTEM EVENTS24/05/2016 03:24:22 PM

Update Non-credible contingency event - NSW region - 24 May 2016

AEMO ELECTRICITY MARKET NOTICE

Update Non-credible contingency event - NSW region - 24 May 2016

Refer market notice 53511

At 0950 hrs the Tuggerah 330kV circuit breakers 212A and 2M2A opened simultaneously.

The cause of this non credible contingency event is not known at this stage.

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm