90474PRICES SUBJECT TO REVIEW14/09/2021 03:25:19 PM

[EventId:202109141530_review] Prices for interval 14-Sep-2021 15:30 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1525 hrs on 14 September 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 14-Sep-2021 15:30.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
90473PRICES SUBJECT TO REVIEW14/09/2021 03:20:16 PM

[EventId:202109141525_review] Prices for interval 14-Sep-2021 15:25 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1520 hrs on 14 September 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 14-Sep-2021 15:25.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
90472MARKET INTERVENTION14/09/2021 04:32:37 PM

Direction - SA Region - 14/09/2021

AEMO ELECTRICITY MARKET NOTICE

Direction - SA Region - 14/09/2021

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1635 hrs on 14/09/2021.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations





90470MARKET INTERVENTION14/09/2021 03:06:05 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units currently expected to be synchronised in SA from 0930 hrs 15/09/2021 to 1500 hrs 15/09/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO estimates that, in the absence of sufficient market response by 1630 hrs 14/09/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations

90469INTER-REGIONAL TRANSFER14/09/2021 01:38:41 PM

Update - Inter-regional transfer limit variation - Bulli Creek- Dumaresq 8L 330 kV Line - NSW/QLD regions - 14/09/2021

AEMO ELECTRICITY MARKET NOTICE

Update - Inter-regional transfer limit variation - Bulli Creek- Dumaresq 8L 330 kV Line - NSW/QLD regions - 14/09/2021

Refer AEMO Market Notice 90468

A planned outage of Bulli Creek- Dumaresq 8L 330 kV Line in the NSW/QLD regions was scheduled for completion at 1200 hrs 14/09/2021.

The outage has been rescheduled for completion for 1600 hrs 14/09/2021.

Constraint set(s) invoked: I-BCDM_ONE


This constraint set(s) contains equations with the following interconnectors on the LHS.

N-Q-MNSP1
NSW1 - QLD1
T-V-MNSP1
V-SA
V-S-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
90468INTER-REGIONAL TRANSFER14/09/2021 12:32:38 PM

Inter-regional transfer limit variation - Bulli Creek- Dumaresq 8L 330 kV Line - NSW/QLD regions - 14/09/2021

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Bulli Creek- Dumaresq 8L 330 kV Line - NSW/QLD regions - 14/09/2021

A planned outage of Bulli Creek- Dumaresq 8L 330 kV Line in the NSW/QLD regions was scheduled for completion at 1200 hrs 14/09/2021.

The outage has been rescheduled for completion for 1400 hrs 14/09/2021.

Constraint set(s) invoked: I-BCDM_ONE


This constraint set(s) contains equations with the following interconnectors on the LHS.

N-Q-MNSP1
NSW1 - QLD1
T-V-MNSP1
V-SA
V-S-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations





90467RESERVE NOTICE14/09/2021 11:37:46 AM

RESERVE NOTICE MT PASA PUBLICATION 14 September 2021

The MTPASA result published on 14 September 2021 identifies no Low Reserve Conditions.

Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any market intervention or direction from AEMO.

For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy

This notice supersedes Market Notice 90261 published on 7 September 2021.

Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.

For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Planning-and-forecasting/Reliability-Standard-Implementation-Guidelines

Forecasting
AEMO
90466NON-CONFORMANCE13/09/2021 06:40:19 PM

NON-CONFORMANCE Region SA1 Monday, 13 September 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE SA1 Region Monday, 13 September 2021

AEMO declared a schedule generating unit non-conforming

Unit: BARKIPS1
Duration: 13/09/2021 18:35 to 13/09/2021 18:40
Amount: -20 MW
Constraint: NC-S_BARKIPS1

Auto-generated on behalf of Manager NEM Real Time Operations
90465PRICES UNCHANGED13/09/2021 04:34:46 PM

[EventId:202109131610_confirmed] Prices for interval 13-Sep-2021 16:10 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 13 September 2021

PRICES ARE NOW CONFIRMED for dispatch interval 13-Sep-2021 16:10.

In accordance with Market Notice 90451 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.