Facility Standing Data Templates
Appendix 1 of the Market Rules describes the Standing Data to be maintained by AEMO. The WEM: Registration Technical Guide further specifies the formats of the Facility Standing Data required . The below templates are provided in accordance with the formats specified for the use of Market Participants in submitting Standing Data in the WEMS MPI.
SCED Market (RTM) Templates
-
Scheduled Facility
-
Semi-Scheduled Facility
-
Non-Scheduled Facility
-
Interruptible Load
Balancing Market Templates
-
Demand Side Programs
-
Scheduled Generators
-
12/07/2017
Appendix_1.(b).iiA
59 B -
12/07/2017
Appendix_1.(b).iv
59 B -
12/07/2017
Appendix_1.(b).viii
58 B -
12/07/2017
Appendix_1.(b).ix
47 B -
12/07/2017
Appendix_1.(b).x1
87 B -
12/07/2017
Appendix_1.(b).x2
91 B -
12/07/2017
Appendix_1.(b).x4
94 B -
12/07/2017
Appendix_1.(b).xi
296 B -
12/07/2017
Appendix_1.(b).xv
89 B -
12/07/2017
Appendix_1.(b).xvi
229 B -
12/07/2017
Appendix_1.(b).xxiii
113 B
-
-
Non-Scheduled Generators
-
Interruptible Load