Market Notices

114643POWER SYSTEM EVENTS13/02/2024 04:13:14 PM

Significant power system event - Victoria Region - Hazelwood transformers -13/02/2024

AEMO ELECTRICITY MARKET NOTICE.

At 1543 hrs 13/02/2024 At Hazelwood terminal station in the Victoria region the following plant tripped.

The No1 500 kV / 220 kV transformer
The No2 500 kV / 220 kV transformer
The No3 500 kV / 220 kV transformer
The No4 500 kV / 220 kV transformer
The Jeeralang Hazelwood No2 220kV line.

Refer Market notice 114641

Updates will be provided as additional information becomes available.

This Market Notice is issued in accordance with NER clause 4.8.3.


Manager NEM Real Time Operations
114642POWER SYSTEM EVENTS13/02/2024 04:14:12 PM

Non-credible contingency event - TAS region - 13/02/2024

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - TAS region - 13/02/2024

At 1602 hrs the Norwood -Scottsdale 110kV line and the Norwood - Scottsdale -Derby 110kV line tripped.

AEMO did not instruct load shedding.

AEMO has been advised 8MW of electrical load and 24MW of generation has been disconnected.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
114625POWER SYSTEM EVENTS13/02/2024 03:06:04 PM

Significant power system event - Victoria region - 13/02/2024

AEMO ELECTRICITY MARKET NOTICE.

At 1308 hrs 13/02/2024 the Moorabool Sydenham No1 and No2 500 kV lines tripped.
There have been reports of towers on the ground.

In the Victorian region
1000 MW of customer load lost during the fault has been restored
2690 Generation tripped

The AEMO instructed loadshed of 300 MW is being progressively restored.

Updates will be provided as additional information becomes available.

This Market Notice is issued in accordance with NER clause 4.8.3.

Manager NEM Real Time Operations
114616SETTLEMENTS RESIDUE13/02/2024 02:52:18 PM

[EventId:202402131450_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 13 February 2024 14:50

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1450 hrs on 13 February 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 February 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1450 hrs on 13 February 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
114615SETTLEMENTS RESIDUE13/02/2024 02:51:16 PM

[EventId:202402131450_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 13 February 2024 14:50

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1450 hrs on 13 February 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 13 February 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to NSW directional interconnector.

The negative residue constraint set NRM_VIC1_NSW1 commenced operating from 1450 hrs on 13 February 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
114580SETTLEMENTS RESIDUE13/02/2024 01:31:25 PM

[EventId:202402131330_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 13 February 2024 13:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1330 hrs on 13 February 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 February 2024.

Refer to market notice: 114574

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1330 hrs on 13 February 2024.

This is an AEMO autogenerated Market Notice.
114577POWER SYSTEM EVENTS13/02/2024 01:22:13 PM

Significant power system event - 13 Feb 2024

AEMO ELECTRICITY MARKET NOTICE.

Significant power system event - 13 Feb 2024

At 1308 hrs 13/02/2024 a significant power system event occurred.

Description of event - Multiple tripping of generation and transmission lines in the Vic region

Transmission element(s) tripped - Moorabool Sydenham No1 and No2 500 kV lines tripped

Region/s - Vic

Load interrupted - in excess of 1000 MW

Generation volume tripped - 2300 MW

Updates will be provided as additional information becomes available.

This Market Notice is issued in accordance with NER clause 4.8.3.


Manager NEM Real Time Operations
114574SETTLEMENTS RESIDUE13/02/2024 12:36:58 PM

[EventId:202402131235_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 13 February 2024 12:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1235 hrs on 13 February 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 February 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1235 hrs on 13 February 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
114497SETTLEMENTS RESIDUE11/02/2024 01:00:21 PM

[EventId:202402111300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 11 February 2024 13:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1300 hrs on 11 February 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 February 2024.

Refer to market notice: 114496

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 11 February 2024.

This is an AEMO autogenerated Market Notice.
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm