Update: Forecast Lack Of Reserve Level 1(LOR1) in the South Australia region - STPASA - 4, 6 and 7 July 2016
RE: AEMO Electricity Market Notice(s) No. 54183.
NOTICE OF UPDATE
AEMO declares a Forecast LOR1 condition for the South Australia region for the following period(s):
1. From 04/07/2016 1800 hrs to 1900 hrs
The minimum reserve available is 365 MW.
2. From 06/07/2016 1800 hrs to 2100 hrs
The minimum reserve available is 273 MW.
3. From 07/07/2016 1800 hrs to 2100 hrs
The minimum reserve available is 217 MW.
The contingency capacity reserve required over the above periods of forecast LOR1 conditions is 400 MW.
Harmohan Singh
Operations Planning
Update: Forecast Lack Of Reserve Level 1(LOR1) in the South Australia region - STPASA - 6 July 2016
RE: AEMO Electricity Market Notice No. 54173 & 54178.
NOTICE OF UPDATE
AEMO declares a Forecast LOR1 condition for the South Australia region for the following period:
From 06/07/2016 1800 hrs to 2030 hrs
The contingency capacity reserve required is 400 MW.
The minimum reserve available is 296 MW.
Harmohan Singh
Operations Planning
Update: Forecast Lack Of Reserve Level 1(LOR1) in the South Australia region - STPASA - 4 to 6 July 2016
RE: AEMO Electricity Market Notice No. 54159 & 54172.
NOTICE OF UPDATE
AEMO declares a Forecast LOR1 condition for the South Australia region for the following period(s):
1. From 04/07/2016 1730 hrs to 2130 hrs
The minimum reserve available is 166 MW
2. From 05/07/2016 1830 hrs to 1930 hrs
The minimum reserve available is 378 MW
3. From 06/07/2016 1800 hrs to 2100 hrs
The minimum reserve available is 284 MW
The contingency capacity reserve required over the above periods of forecast LOR1 conditions is 400 MW.
Harmohan Singh
Operations Planning
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia region - STPASA - 4-5 July 2016
AEMO declares a Forecast LOR1 condition for the South Australia region for the following period(s):
1. From 04/07/2016 1230 hrs to 2300 hrs
The contingency capacity reserve required is 400 MW
The minimum reserve available is 247 MW
2. From 04/07/2016 2330 hrs to 05/07/2016 0030 hrs
The contingency capacity reserve required is 400 MW
The minimum reserve available is 281 MW
3. From 05/07/2016 1800 hrs to 2030 hrs
The contingency capacity reserve required is 400 MW
The minimum reserve available is 285 MW
Harmohan Singh
Operations Planning
Non-credible contingency event - Vic region - 16/06/16
Non-credible contingency event - Vic region - 16/06/16
At 1106 hrs the following plant tripped.
Loy Yang No. 1 and No. 3 500 kV Bus
Hazelwood - Loy Yang No. 2 500 kV Line
Loy Yang No. 1 500/220 kV Transformer
Loy Yang A1 generating unit
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - NSW region - 11 June 2016
Non-credible contingency event - NSW region - 11 June 2016
At 0950 hrs the Wagga substation 132kV B bus, the No2 and the No3 330/132kV transformers tripped.
AEMO did not observe any reduction in electrical demand
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update - Non-Credible Contingency Event - Vic Region - 8 June 2016
Update - Non-credible contingency event - Victoria region - 8 June 2016
Update to MN 53704
At 0219 hrs the Yallourn No. 2 220 kV bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-Credible Contingency Event - Vic Region - 8 June 2016
Non-credible contingency event - Victoria region - 8 June 2016
At 0129 hrs the Yallourn No. 2 220 kV bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Non-Credible Contingency Event - Vic Region - Tues 7th Jun 2016
Non-Credible Contingency Event - Vic Region - Tues 7th Jun 2016
At 1610 hrs the Richmond No 2 and No 4 220 kV Buses tripped in the Victoria region.
(Coincident with a planned outage Rowville - Richmond No 1 220 kV Line )
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is known
Manager NEM Real Time Operations