Filter by category
Filter by Date
Cancellation of Actual (LOR1) condition in the South Australia region - 6/1/17
Correction to Market notice 56660 - should be type Market notice type Reserve Notice.
Cancellation of Actual (LOR1) condition in the South Australia region - 6/1/17
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No.56660 is cancelled at 1745 hrs 6/1/17.
Manager NEM Real Time Operations
Direction ceased - Victoria Region region 1/12/16
Direction - Victoria Region region 1/12/16
In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the Victoria region.
The direction was necessary to re-establish the power system to a secure operating state,
The direction was issued at 1030 hrs and ceased at 1545hrs /1/2/16
Manager NEM Real Time Operations
AEMO Intervention Event intervention price dispatch intervals - 1/12/16
AEMO Intervention Event intervention price dispatch intervals - 1/12/16
Refer AEMO Electricity Market Notice no. 56046
An AEMO Intervention Event has been implemented by issuing a direction to re-establish the power system to a secure operating state.
AEMO declares all dispatch intervals during the AEMO Intervention Event to be intervention price dispatch intervals.
The AEMO Intervention Event commenced in the 1035 hrs dispatch interval.
Intervention pricing will not be implemented during these intervention price dispatch intervals.
Manager NEM Real Time Operations
Direction - Victoria Region region 1/12/16
Direction - Victoria Region region 1/12/16
In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the Victoria region.
The direction was necessary to re-establish the power system to a secure operating state,
The direction was issued at 1030 hrs and is expected to stay in place until further notice
Manager NEM Real Time Operations
AEMO Intervention Event intervention price dispatch intervals - 1/12/16
AEMO Intervention Event intervention price dispatch intervals - 1/12/16
Refer AEMO Electricity Market Notice no. 55973 and 56015
An AEMO Intervention Event has been implemented by issuing a direction to maintain the power system in a secure operating state.
AEMO declares all dispatch intervals during the AEMO Intervention Event to be intervention price dispatch intervals.
The AEMO Intervention Event commenced in the 0135 hrs dispatch interval.
Intervention pricing will be implemented during these intervention price dispatch intervals from the 0135 hrs dispatch interval until the end of the AEMO Intervention Event at 0500 hrs 1/12/16
Manager NEM Real Time Operations
Cancellation of Directions - South Australia region 01/12/2016
Cancellation of Directions - South Australia region 01/12/2016
In accordance with clause 4.8.9 of the National Electricity Rules AEMO had issued directions to participants in the South Australia region.
The directions were necessary to maintain the power system in a secure operating state.
The directions are no longer required and have been cancelled from 0500 hrs 01/12/2016
Manager NEM Real Time Operations
Direction - South Australia region 01/12/2016
Direction - South Australia region 01/12/2016
In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued directions to participants in the South Australia region.
The directions were necessary to maintain the power system in a secure operating state.
The directions was issued from 0130 hrs 01/12/2016 and will remain in place until further notice.
Manager NEM Real Time Operations
Cancellation - Direction - South Australia region 11/10/16
Cancellation - Direction - South Australia region 11/10/16
Refer AEMO Electricity Market Notice 55339
The direction to a participant in the South Australia region was cancelled at 1906 hrs 11/10/16
Manager NEM Real Time Operations
Direction - South Australia region 11/10/16
Direction - South Australia region 11/10/16
In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the South Australia region.
The direction was necessary to maintain the power system in a secure operating state.
The direction was issued at 1616 hrs 11/10/16 and is expected to stay in place until 0700 hrs 12/10/16.
Manager NEM Real Time Operations