53621INTER-REGIONAL TRANSFER05/06/2016 05:50:33 AM

Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275 kV Line (Qld) - Voltage Control - 5 June 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275 kV Line (Qld) - Voltage Control - 5 June 2016

Refer AEMO Electricity Market Notice 53620

The Greenbank to Middle Ridge (8848) 275 kV Line has been returned to service.

Constraint set Q-MRGB_8848_8849 revoked at 0550 hrs.

The constraint set contains equations with the following interconnectors on the LHS:

NSW-QLD1
N-Q-MNSP1

Manager NEM Real Time Operations
53620INTER-REGIONAL TRANSFER05/06/2016 01:59:04 AM

Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275kV Line (Qld) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275kV Line (Qld) - Voltage Control - 5 June 2016

The Greenbank to Middle Ridge (8848) 275kV Line has been de-energised to manage voltages in the Qld region.

The following constraint set was invoked at 0155 hrs until further notice.
Q-MRGB_8848_8849

The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1

Manager NEM Real Time Operations
53603INTER-REGIONAL TRANSFER03/06/2016 05:55:58 PM

Cancellation - Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016

Refer to MN 53602

An unplanned outage of the No 2 Leg of Directlink returned to service at 1755 hrs

Constraint set N-X_MBTE_1 revoked

The outage constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Manager NEM Real Time Operations
53602INTER-REGIONAL TRANSFER03/06/2016 05:32:11 PM

Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016

An unplanned outage of the No 2 Leg of Directlink occurred at 1717 hrs

See AEMO Network Outage Scheduler (NOS) for details and return to service times.

Constraint set N-X_MBTE_1 invoked from 1730 hrs.

The outage constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Manager NEM Real Time Operations
53581RESERVE NOTICE02/06/2016 07:18:47 AM

Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 02/06/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 02/06/2016

The Forecast LOR1 condition in the Tasmania Region advised in AEMO Electricity Market Notice No. 53580 is cancelled at 0710hrs 02/06/2016.


Manager NEM Real Time Operations
53580RESERVE NOTICE02/06/2016 04:24:17 AM

Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PD PASA - 02/06/2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PD PASA - 02/06/2016

AEMO declares a Forecast LOR1 condition for the Tasmania Region.

From 0730 hrs to 0830 hrs Thursday, 2 June 2016

The contingency capacity reserve required is 288 MW

The minimum reserve available is 264 MW


Manager NEM Real Time Operations

53576RESERVE NOTICE01/06/2016 07:43:49 AM

Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 01/06/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 01/06/2016

The Forecast LOR1 condition in the Tasmania Region advised in AEMO Electricity Market Notices No. 53574 and 53575 is cancelled at 0741hrs 01/06/2016.


Manager NEM Real Time Operations
53575RESERVE NOTICE01/06/2016 06:00:29 AM

Update - Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016

AEMO ELECTRICITY MARKET NOTICE
Update to Market Notice 53574
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0700 hrs to 0930 hrs 01/06/16
The contingency capacity reserve required is 263 MW
The minimum reserve available is 190 MW

Manager NEM Real Time Operations
53574RESERVE NOTICE01/06/2016 01:46:03 AM

orecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0730 hrs to 0830 hrs 01/06/16
The contingency capacity reserve required is 263MW
The minimum reserve available is 254 MW

Manager NEM Real Time Operations