Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275 kV Line (Qld) - Voltage Control - 5 June 2016
Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275 kV Line (Qld) - Voltage Control - 5 June 2016
Refer AEMO Electricity Market Notice 53620
The Greenbank to Middle Ridge (8848) 275 kV Line has been returned to service.
Constraint set Q-MRGB_8848_8849 revoked at 0550 hrs.
The constraint set contains equations with the following interconnectors on the LHS:
NSW-QLD1
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275kV Line (Qld) - Voltage Control
Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275kV Line (Qld) - Voltage Control - 5 June 2016
The Greenbank to Middle Ridge (8848) 275kV Line has been de-energised to manage voltages in the Qld region.
The following constraint set was invoked at 0155 hrs until further notice.
Q-MRGB_8848_8849
The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1
Manager NEM Real Time Operations
Cancellation - Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016
Cancellation - Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016
Refer to MN 53602
An unplanned outage of the No 2 Leg of Directlink returned to service at 1755 hrs
Constraint set N-X_MBTE_1 revoked
The outage constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016
Inter-Regional Transfer Limit Variation - NSW Region - Directlink - Fri 3 Jun 2016
An unplanned outage of the No 2 Leg of Directlink occurred at 1717 hrs
See AEMO Network Outage Scheduler (NOS) for details and return to service times.
Constraint set N-X_MBTE_1 invoked from 1730 hrs.
The outage constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Manager NEM Real Time Operations
Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 02/06/2016
Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 02/06/2016
The Forecast LOR1 condition in the Tasmania Region advised in AEMO Electricity Market Notice No. 53580 is cancelled at 0710hrs 02/06/2016.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PD PASA - 02/06/2016
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PD PASA - 02/06/2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0730 hrs to 0830 hrs Thursday, 2 June 2016
The contingency capacity reserve required is 288 MW
The minimum reserve available is 264 MW
Manager NEM Real Time Operations
Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 01/06/2016
Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 01/06/2016
The Forecast LOR1 condition in the Tasmania Region advised in AEMO Electricity Market Notices No. 53574 and 53575 is cancelled at 0741hrs 01/06/2016.
Manager NEM Real Time Operations
Update - Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
Update to Market Notice 53574
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0700 hrs to 0930 hrs 01/06/16
The contingency capacity reserve required is 263 MW
The minimum reserve available is 190 MW
Manager NEM Real Time Operations
orecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0730 hrs to 0830 hrs 01/06/16
The contingency capacity reserve required is 263MW
The minimum reserve available is 254 MW
Manager NEM Real Time Operations