Update to system strength constraints in North Queensland
Refer to market notice 110677
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of new feeder 8905 (H13 Ross - H39 Woree) 275kV line in Far North Queensland, the system normal system strength equations for low North Queensland demands and all Karreya stations out of service conditions have been revised.
A revision to the constraint equations will be implemented at 1400 hrs on Tuesday 20th February 2024.
The new system strength combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice
This advice contains all the combinations for Queensland for system normal cases.
Below constraint equations in the Q-NIL set will be modified:
- Q_NIL_STRGTH_KBWF
- Q_NIL_STRGTH_KBWF_I
- Q_NIL_STRGTH_HAUSF
- Q_NIL_STRGTH_HAUSF_I
- Q_NIL_STRGTH_MEWF
- Q_NIL_STRGTH_MEWF_I
AEMO Operations
[EventId:202402131320_confirmed] Prices for interval 13-Feb-2024 13:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1452 hrs on 14 February 2024
PRICES ARE NOW CONFIRMED for trading interval 13-Feb-2024 13:20.
In accordance with Market Notice 114583 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
- Over-Constrained Dispatch has been resolved for dispatch interval
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
NSW1 -$38.41 -$35.04
QLD1 -$40.60 -$36.57
LOWERREG
TAS1 $16,600.00 $9.88
RAISEREG
TAS1 $16,600.00 $150.68
This is an AEMO autogenerated Market Notice.
Load Restoration Direction Cancellation in the Vic Region
Cancellation - Load Restoration Direction in the Vic Region - 13/02/2024
Refer to AEMO Electricity Market Notice ID 114607
Load restoration as directed is complete. Direction cancelled from 1510 hrs 13/02/2024.
Manager NEM Real Time Operations
Load Restoration Direction in the Vic Region
Load Restoration Direction in the Vic Region
AEMO has directed load restoration commencing at 1450 hrs 13/02/2024 in the Victoria region
The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.
Manager NEM Real Time Operations
Updated Victorian system normal voltage oscillation limit
AEMO has completed a comprehensive review on voltage oscillation issue in south-west Victoria with consideration of wider asynchronous generators in the area. The voltage oscillation occurs in the south-west region when Heywood interconnector flow is higher than 500 MW from South Australia to Victoria.
The limit will manage the total MW output from Stockyard Hill, Dundonnell and Macarthur wind farms during period when flow on Heywood interconnector higher than 500 MW towards Victoria.
The new constraint equation includes asynchronous generators in south-west Victoria on the left-hand side. This limit is to replace the existing south-west Victoria voltage oscillation limit. Full details on the limits advice are to be published shortly on the AEMO website: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice
The following changes will be implemented at 1000 hrs on Friday 3rd November 2023
? Constraint equation will be removed from constraint set V-NIL:
V_SHWF_FLT_286
? Constraint equation will be implemented and added to constraint set V-NIL:
V_SH_DD_MAC_FLT_965
For full details on the formulation, the new constraint equation has now been loaded into AEMO's pre-production systems.
For further details on this change please contact terry.liu@aemo.com.au
Terry Liu
AEMO Operations
Update to voltage stability and system strength constraints in North Queensland
Refer to market notice 102074
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of new feeder 8905 (H13 Ross - H39 Woree) 275kV line in Far North Queensland, the system normal equations for system strength and voltage stability have been revised.
A revision to the constraint equations will be implemented at 1400 hrs on Thursday 2nd November 2023.
The new system strength combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice
This advice contains all the combinations for Queensland for system normal cases.
The constraint equations in the Q-NIL set below will be modified:
? Q_NIL_STRGTH_KBWF
? Q_NIL_STRGTH_KBWF
? Replace Q^NIL_FNQ_MEWF and Q^NIL_FNQ_WRSVC with new equation Q^NIL_FNQ_8905
AEMO Operations
[EventId:202304221620_confirmed] Prices for interval 22-Apr-2023 16:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1451 hrs on 24 April 2023
PRICES ARE NOW CONFIRMED for trading interval 22-Apr-2023 16:20.
In accordance with Market Notice
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
SA1 $92.11 $45.06
VIC1 $94.42 $44.94
LOWER5MIN
VIC1 $0.39 $2.38
LOWER60SEC
VIC1 $0.38 $4.24
LOWER6SEC
VIC1 $0.38 $0.53
LOWERREG
VIC1 $25.13 $13.67
RAISE5MIN
VIC1 $0.39 $0.37
RAISE60SEC
VIC1 $2.25 $1.00
RAISE6SEC
VIC1 $2.96 $1.28
RAISEREG
VIC1 $60.00 $33.61
This is an AEMO autogenerated Market Notice.
Tasmanian Regulation FCAS changes - Wednesday 5th April 2023
AEMO are changing the procurement of Regulation FCAS for the TAS region.
This change is based on advice received from TasNetworks, following a review of operation of the TAS region with the end of the reclassification of Basslink.
Refer to AEMO Electricity market notice 105443.
Following this change Regulation FCAS requirements for the TAS region will only be procured from within TAS.
This change will be implemented from 1000 on Wed 5th April.
Ben Blake
Manager Congestion & Grid Modelling
Update to Victorian system normal constraint equations ID
AEMO has been conducting major review of thermal constraint equations for preparation of completion of VNI East project. As part of the review, AEMO is going to update the constraint equations IDs to use the new standard format of below (this is the same standard now used in NSW):
V>>[OUTAGE]_[MONITORING ELEMENT]_[CONTINGENCY ELEMENT]
This is to improve the simplicity and readability of a thermal constraint equation ID.
Constraint equations ID in sets V-NIL and V-NIL_BATS_BETS_15M will be updated to the new format on Thursday 23rd March 2023 at 1000 hrs. The previous used constraint equations ID will be included in the Modification field of the constraint equation for reference.
The changes have now been implemented into AEMO's pre-production system.
Terry Liu
AEMO Operations