Filter by category
Filter by Date
[EventId:201609282235_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 28 September 2016 22:35
Issued by Australian Energy Market Operator Ltd at 2235 hrs on 28 September 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 28 September 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 2235 hrs on 28 September 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201609282055_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 28 September 2016 20:55
Issued by Australian Energy Market Operator Ltd at 2055 hrs on 28 September 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 28 September 2016.
Refer to market notice: 55018
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 2055 hrs on 28 September 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201609282035_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 28 September 2016 20:35
Issued by Australian Energy Market Operator Ltd at 2035 hrs on 28 September 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 28 September 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 2035 hrs on 28 September 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201609222000_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 22 September 2016 20:00
Issued by Australian Energy Market Operator Ltd at 2000 hrs on 22 September 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 22 September 2016.
Refer to market notice: 54947
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 2000 hrs on 22 September 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201609221840_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 22 September 2016 18:40
Issued by Australian Energy Market Operator Ltd at 1840 hrs on 22 September 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 22 September 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1840 hrs on 22 September 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16
Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 54507 is cancelled at 2030 hrs 14/07/16
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16.
An Actual LOR1 condition has been declared for the SA Region from 1745 hrs.
The Actual LOR1 condition is forecast to exist until 2030 hrs
The contingency capacity reserve required is 440 MW
The minimum reserve available is 342 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16
Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 544785 is cancelled at 2100 hrs 13/07/16
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16.
An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 2100 hrs
The contingency capacity reserve required is 400 MW
The minimum reserve available is 281 MW
Manager NEM Real Time Operations