Market Notices

116739NON-CONFORMANCE21/05/2024 05:01:14 PM

NON-CONFORMANCE Region NSW1 Tuesday, 21 May 2024

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Tuesday, 21 May 2024

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: BW04
Duration: 21/05/2024 16:30 to 21/05/2024 16:35
Amount: -19 MW
Constraint: NC-N_BW04

Auto-generated on behalf of Manager NEM Real Time Operations
     
116738NON-CONFORMANCE21/05/2024 05:00:17 PM

NON-CONFORMANCE Region NSW1 Tuesday, 21 May 2024

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Tuesday, 21 May 2024

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: BW04
Duration: 21/05/2024 10:45 to 21/05/2024 10:50
Amount: -22 MW
Constraint: NC-N_BW04

Auto-generated on behalf of Manager NEM Real Time Operations
     
116737RESERVE NOTICE21/05/2024 03:29:47 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 23/05/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 116724 is cancelled at 1400 hrs 21/05/2024.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
116736RESERVE NOTICE21/05/2024 03:30:30 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 22/05/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 116723 is cancelled at 1400 hrs 21/05/2024.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
116735INTER-REGIONAL TRANSFER21/05/2024 08:20:42 AM

Update Inter-Regional Transfer limit variation - Basslink 21/05/2024

AEMO ELECTRICITY MARKET NOTICE

Update Inter-Regional Transfer limit variation - Basslink

Refer AEMO Electricity Market Notice 116734

There was an unplanned outage of the Basslink interconnector at 0235 hrs. The Basslink interconnector has been returned to service.

The following constraint set was revoked at 0810 hrs 21/05/2024

I-BL_ZERO

The constraint set contains the following interconnector on the left hand side.

T-V-MNSP1

Manager NEM Real Time Operations
     
116734INTER-REGIONAL TRANSFER21/05/2024 02:51:33 AM

Inter-Regional Transfer limit variation - Basslink 21/05/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Basslink

There has been an unplanned outage of the Basslink interconnector at 0235 hrs

The following constraint set was invoked at 0240 hrs 21/05/2024

I-BL_ZERO

The constraint set contains the following interconnector on the left hand side.

T-V-MNSP1

Manager NEM Real Time Operations
     
116728RESERVE NOTICE20/05/2024 03:58:09 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 21/05/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 116722 for the 21/05/2024 is cancelled at 1600 hrs 20/05/2024.

Manager NEM Real Time Operations
     
116725RESERVE NOTICE20/05/2024 02:56:01 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 20/05/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No.116700 has been updated at 1450 hrs to the following:

[1.] From 1630 hrs 20/05/2024 to 1900 hrs 20/05/2024.
The forecast capacity reserve requirement is 1630 MW.
The minimum capacity reserve available is 958 MW.

Manager NEM Real Time Operations
     
116724RESERVE NOTICE20/05/2024 03:33:00 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 23/05/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 0000 hrs to 0130 hrs 23/05/2024.
The forecast capacity reserve requirement is 1640 MW.
The minimum capacity reserve available is 1422 MW.

AEMO Operations
     